Unscrew the two hexagon head cap screws A (figure 21) in the back board of the connection box with which
this one is mounted to the retaining plate.
Hexagon screws B
Cable gland C
Figure 21
Position of fixing screws of connection box, thermostat sensor and heating cartridge carrier plate
Unscrew the hexagon head cap screws B (figure 21) for the fastening of the heating cartridge retaining plate
and the thermostat sensor retaining plate.
Remove the connection box including the heater cartridge and the thermostat sensor.
Figure 22
Dismounted electrical connection box with heating cartridge and thermostat sensor
Loosen the cable gland C (figure 21) for the heating cartridge and the capillary tubes of the thermostat.
Disconnect the electrical connection lines of the heating cartridge and the termostat from the terminal block
(figure 9).
Take off the turning knob from the thermostat. Remove the 2 locking screws D (figure 23) beneath. Take off the
locking screws E (figure 23) of the thermostat retaining plate.
www.mc-techgroup.com
Hexagon screws A
SP2000, SP2300, SP2400 | 1.00.03
43