Epson T-B Series Maintenance Manual page 103

Scara robot
Hide thumbs Also See for T-B Series:
Table of Contents

Advertisement

(6) Apply the proper tension to the Z belt, and
secure the Joint #3 motor unit.
T3-B: a: 2-M4×15+M4 slotted hole washer
T6-B: ab: 3-M4×15+M4 washer
Pass a suitable cord or string around the
plate hole of the Joint #3 motor unit. Then,
pull the cord using a force gage or similar
tool to apply the specified tension shown
below.
Z belt tension:
Axial force (when pulling):
Apply the following torque to secure the plate.
To check belt tension with the tension meter, refer to the following.
NOTE
11.4 Checking the Timing Belt Tension (Z Belt)
(7) Mount the Joint # 2, 3, 4 AMP board unit.
Connect the following connectors to the AMP
board unit.
A: Power cable connector (×3)
B: AMP cable connector (×3)
C: Motor cable connector (×3)
D: Brake cable connector (×1)
(8) Connect the connector of Joint #3 motor unit.
T-B series Maintenance Manual Rev.1
b: M3×12+M3 slotted hole washer
34.5 N (3.5 ± 0.5 kgf)
69.0 N (7.0 ± 0.5 kgf)
M3: 2 ± 0.1 N·m
M4: 4 ± 0.2 N·m
Sems bolt: 2-M3×10
Tightening torque: 0.9 ± 0.05 N·m
A: AMP cable connector (×1)
B: Signal cable connector
(IN/OUT ×1 for each)
T3-B T6-B Maintenance 11. Joint #3
b
Joint #3
motor unit
a
Z belt
T3-B
Joint #2, 3, 4 AMP
board unit
B
D
A
B-OUT B-IN A
Force gage
C
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

T3-b401s, t6-b602s

Table of Contents