Preparation
In-hospital transport
Preparing the unit for in-hospital transport
If optional height adjustment is available, lower the unit
to ultimate position.
Slide swivel drawers inward.
Slide swivel table inward.
Accessory equipment wich projects the unit on either
side must be detached or inverted.
Switch off heating system and unplug mains
connector.
Detach gas supply hoses from pipeline system.
For in-hospital transport of a patient in
Babytherm 8000 OC:
Open oxygen cylinder valve.
Position the cover (accessory) to protect the child
from draughts. The internal temperature can be read
on the thermometer from the cover.
Immediately after transport:
Plug in mains connector and activate heating systems.
12