Chapter 3 Installation; Tank Fill Bracket Kit (50 Series Machines); Install The Tank Fill Bracket - Raven Apache AS840 Installation Manual

Table of Contents

Advertisement

I NSTALLATION
CHAPTER
C H A P T E R 3
3

TANK FILL BRACKET KIT (50 SERIES MACHINES)

This kit is only necessary if the machine is not equipped with the front tank fill option.

INSTALL THE TANK FILL BRACKET

1. Open the hood and remove the four bolts on the frame rail on the right side of the machine.
2. Install the tank fill bracket (P/N 116-0159-867) to the frame of the machine.
FIGURE 1. Tank Fill Bracket
Tank Fill Bracket
3. Use the two supplied 3/4"-10x3" long bolts and washers in the top two holes of the tank fill bracket.
4. Use the two longer bolts that were previously removed in the bottom two holes of the frame rail.
5. Secure the bolts with the washers and nuts that were previously removed from the machine.