Raven AIM Command FLEX Installation Manual

Patriot my 2017

Advertisement

Quick Links

AIM Command FLEX, Patriot
MY 2017 Installation Manual
P/N 016-0171-633 Rev. B
02/17
E29154
Copyright 2017

Advertisement

Table of Contents
loading

Summary of Contents for Raven AIM Command FLEX

  • Page 1 AIM Command FLEX, Patriot MY 2017 Installation Manual P/N 016-0171-633 Rev. B 02/17 E29154 Copyright 2017...
  • Page 2 GPS, GNSS, SBAS, etc.). Therefore, Raven Industries cannot guarantee the accuracy, integrity, continuity, or availability of these services and cannot guarantee the ability to use Raven systems, or products used as components of systems, which rely upon the reception of these signals or availability of these services.
  • Page 3: Table Of Contents

    Updates ........................... 12 Chapter 3 Boom Installation..............13 Install Harness Mount Blocks ....................13 AIM Command FLEX Nozzle Control Valve Installation ............13 Best Practices and Recommendations ................13 Boom Cable Routing and Connection ..................14 Best Practices and Recommendations ................
  • Page 4 Table of Contents AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 5: Chapter 1 Important Safety Information

    • Determine and remain a safe working distance from other individuals. The operator is responsible for disabling AIM Command FLEX when the safe working distance has been diminished. • Ensure AIM Command FLEX is disabled prior to starting any maintenance work on the system or the implement.
  • Page 6: Instructions For Wire Routing

    • Always verify that the power leads are connected to the correct polarity as marked. Reversing the power leads could cause severe damage to the equipment. • Disconnect the AIM Command FLEX system ECUs and control console before jump starting the vehicle or welding on any part of the implement or machine.
  • Page 7: Instructions For Hose Routing

    IMPORTANT SAFETY INFORMATION Allow sufficient clearance from machine component operational zones such as: • Drive shafts, universal joints and hitches (i.e. 3-point hitch) • Pulleys, gears, sprockets • Deflection and backlash of belts and chains • Adjustment zones of adjustable brackets •...
  • Page 8 Ensure connections are clean, dry, and not damaged. Repair or replace components, connections, or cable as necessary. • Clean components or connections using low pressure water, pressurized air, or an aerosol electrical component cleaning agent. AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 9 IMPORTANT SAFETY INFORMATION • Remove visible surface water from components, connections, or seals using pressurized air or an aerosol electrical component cleaning agent. Allow components to dry completely before reconnecting cables. Important Safety Information:...
  • Page 10 HAPTER AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 11: Chapter 2 Introduction

    NOTE: Air induction style spray tips should not be used with the AIM Command FLEX nozzle control system. A fan or cone style spray tip is required for the AIM Command FLEX system to operate properly. TOOLS AND MATERIALS NEEDED The following tools are recommended for completing the installation: •...
  • Page 12: Point Of Reference

    Cable, Mid, Case, 120’ Not Pictured Boom, 20” Spacing, 115-7304-008 Molded Cable, Outer, Case, 120’ Not Pictured Boom, 20” Spacing, 115-7304-009 Molded Cable, Secondary, Case, Not Pictured 100’ Boom, 20” Spacing, 115-7304-089 Molded AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 13 INTRODUCTION Qty. 117-1007- Picture Item Description Part Number Cable, Outer, Case, 80’ Not Pictured Boom, 20” Spacing, 115-7304-200 Molded Cable, Primary, Case, 120’ Not Pictured 115-7304-007 Boom, Molded Cable, Primary, Case, 80’, Not Pictured 115-7304-088 90’, 100’ Boom, Molded Not Pictured Fuse, 30 Amp, Mini Blade 510-1003-044 Clamp, Harness Mount,...
  • Page 14 Not Pictured Guard, ACF Harness 107-0172-509 Not Pictured Spacer, U-Bolt, 107-0172-510 Bracket, Electrical Not Pictured 107-0172-512 Bulkhead Kit, CNH System Service, Not Pictured 117-1005-066 ARAG Kit, CNH System Service, Not Pictured 117-1005-065 Wilger AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 15 TABLE 3. 117-1005-065 Kit Components Picture Item Description Part Number Quantity CNH Nozzle Control Valve, ARAG 063-0173-810 Not Pictured Kit, Seal, AIM Command Flex, ARAG 117-1005-051 Not Pictured AIM Command Flex Valve Jumper 115-7303-139 Single O-Ring, Viton, Brown, Size -116 219-1005-116 Valve Tool...
  • Page 16: Updates

    321-0000-457 Flynut Wrench 321-0000-459 UPDATES Raven software and documentation updates may be made available periodically on the Raven Applied Technology web site: www.ravenhelp.com At Raven Industries, we strive to make your experience with our products as rewarding as possible. One way to improve this experience is to provide us with feedback on this manual.
  • Page 17: Chapter 3 Boom Installation

    AIM COMMAND FLEX NOZZLE CONTROL VALVE INSTALLATION BEST PRACTICES AND RECOMMENDATIONS • If a dual channel turret nozzle body is installed on the implement, always mount the AIM Command FLEX nozzle control valve to the straight nozzle port to avoid excessive pressure drop across the nozzle.
  • Page 18: Boom Cable Routing And Connection

    For a boom cable routing drawing example, refer to the“System Diagram” on page 17. BEST PRACTICES AND RECOMMENDATIONS • Route the AIM Command FLEX primary and secondary boom cables along existing cables or plumbing to help avoid damage to the cable.
  • Page 19: Primary Boom Cable Routing And Connections

    BOOM INSTALLATION 1. Locate the terminator on each of the secondary boom cables (refer to the Kit Contents section on page 8). FIGURE 3. Secondary Cable ISOBUS Powell Terminator Powell Terminator 2. Route the secondary boom cables so the terminators are located at the outer tips of the left and right boom. 3.
  • Page 20 Refer to Figure 4 on page 15. The “TO CHASSIS HARNESS” on the primary boom cable should reach to the center of the implement after all nozzle control valves are connected. 9. Repeat this procedure to route the primary boom cable on the opposite boom. AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 21: System Diagram

    BOOM INSTALLATION SYSTEM DIAGRAM Boom Installation:...
  • Page 22 HAPTER AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 23: Aim Command Flex Adapter Harness Installation

    HARNESS INSTALLATION ADAPTER HARNESS INSTALLATION 1. Locate the AIM Command Flex adapter harness (115-2500-014). 2. Use the provided hardware to attach the fuse block to the rear of the center rack, near the Product Controller II. 3. Use the provided hardware to attach the three relays to the front side of the Product Controller II mounting plate.
  • Page 24 FIGURE 3. 12-Pin Deutsch 12-Pin Deutsch 6. Route the connectors located “Left Boom” and “Right Boom” to the Primary AIM Command Flex nozzle cables installed in “Primary Boom Cable Routing and Connections” on page 15. AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 25 AIM COMMAND FLEX ADAPTER HARNESS INSTALLATION 7. Use the provided u-bolt, spacer, and M10 nuts to install an electrical bulkhead adapter bracket at the left and right boom connections. FIGURE 4. Boom Connectors 8. Locate the fuse panel inside the battery compartment, in front of the right rear wheel.
  • Page 26: Install Nozzle Deflector Brackets On End Of The Boom

    Install the nozzle deflector brackets as shown. These brackets install on the end of the breakaway section of the boom. They provide additional protection to the outer pair of nozzles. FIGURE 6. Nozzle Deflector Brackets FIGURE 7. Nozzle Deflector Installation AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 27 AIM COMMAND FLEX ADAPTER HARNESS INSTALLATION FIGURE 8. Deflector Bracket Installation AIM Command FLEX Adapter Harness Installation:...
  • Page 28 HAPTER AIM Command FLEX, Patriot MY 2017 Installation Manual...
  • Page 29 Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility. The Return...
  • Page 30 How Can I Get Service? Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval.

Table of Contents