FRONT TUNNEL BULKHEAD COOLER
INSTALLATION
1. If installing the original bulkhead cooler, verify any
adhesive is removed from the mating surface.
2. Install the cooler using new rivets
w
3. Install the fasteners
securing the cooler to the
sides of the tunnel. Install new rivet
cooler to the chaincase housing. Torque fasteners to
specification.
TORQUE
Chaincase / Side Support Fasteners:
26 ft-lbs (35 N·m)
Tube Brace Fastener:
22 ft-lbs (30 N·m)
9850064 R03 - 2021 650 / 850 Matryx Trail Performance / Crossover Snowmobile Service Manual
© Copyright Polaris Inc.
4. Reinstall the following components:
• Bulkhead floor plate (See Bulkhead Floor Plate
Installation page 9.35)
q
.
Allow the adhesive to cure for 24 hours at 68 °F (20 °C)
before placing the snowmobile back into service.
• Fuel tank assembly (See Fuel Tank Installation page
5.29)
• Engine assembly (See Engine Installation page 3.39)
e
securing the
CHASSIS
NOTICE
9.37
9