Polaris 850 MATRYX INDY XC 129 2021 Manual page 197

Trail performance crossover snowmobile
Table of Contents

Advertisement

23. Carefully install the air box
snowmobile.
2(
24. Torque gear clamps
to specification.
TORQUE
Air Box to Throttle Body Gear Clamps:
11 in-lbs (1.24 N·m)
NOTICE
If the ignition coils were removed, reinstall the ignition
coils and torque fasteners to specification.
TORQUE
Air Box Coil Fasteners:
36 in-lbs (4 N·m)
9850064 R03 - 2021 650 / 850 Matryx Trail Performance / Crossover Snowmobile Service Manual
© Copyright Polaris Inc.
3)
back into the
ENGINE / COOLING / EXHAUST
25. Install new cable tie on air box routing clip
secure the stator wiring harness and throttle cable.
26. Connect the T-MAP Sensor
2^
and install new cable tie
27. Install the PBR and fasteners
specification.
TORQUE
PBR Fasteners:
6 ft-lbs (8 N·m)
2*
to
2&
to the wiring harness
to secure wiring.
2%
. Torque fasteners to
3.43
3

Advertisement

Table of Contents
loading

Table of Contents