Download Print this page

OLT 12x4 GardenSaver Shed Assembly Manual page 23

Slider ak bevel model with metal roof
Hide thumbs Also See for 12x4 GardenSaver Shed:

Advertisement

37.
Center Facia Nailing Strip (underneath outside of each
batten. Attach with 3 - 1 1/4" Screws evenly spaced into the
batten. The Facia Nailing Strip provides for a greater nailing
surface later when you attach side facia.
Toll Free 1-888-658-1658
38.
Roof Panels (Identical). To temporarily help hold
the Metal Roof Panel in place, hook a Metal Roof
Hanger onto the lower Batten approximately
where the center of the first Panel will be. Place the
first Metal Roof Panel on Battens. Do not fasten
Panels down until Steps 40 & 42. Place other two
Metal Roof Panels with Hangers the same way.
3K - Metal Roof Panels
www.outdoorlivingtoday.com
Page 23
Parts
3J - Nailing Strips
(3/4" x 3/4" x 51") x 2
Metal Roof Hangers will temporarily
help keep Metal Roof Panels in
place before they are fastened.
Locate all Metal Roof Hangers and Metal
Parts
(39" x 58 1/2") x 4
sales@outdoorlivingtoday.com
Hardware
S2 - 1 1/4" Screws
x 6 total
Hardware
Y38 - Metal Roof
Hangers x 4 total

Advertisement

loading