Viessmann Vitoligno 300-C Installation And Service Instructions Manual page 27

18 to 48 kw pellet boiler
Table of Contents

Advertisement

Fitting the ash box
Note
Before inserting the ash box, attach the cover and lock
it with the tensioning toggles.
E
Fig. 19
1. Pull release pin
. Pull ash partition
B
until the release pin latches into place.
2. Push back ash box
C
guide rail
as far as it will go and to the right to
E
the boiler.
Connections on the flue gas side
Danger
Leaking or blocked flue systems, or an insuffi-
cient combustion air supply can cause life
threatening poisoning from flue gas and carbon
monoxide.
Ensure the flue system is in good working
order.
Apertures for combustion air supply must be
non-closable.
The system may only be commissioned once the fol-
lowing conditions are guaranteed:
Unrestricted flow in the flue gas routes.
Flue pipes are routed so that all casing panels are
accessible and can be removed for maintenance.
Flue systems are designed to be gas-tight.
Apertures for sufficient combustion air supply are
non-closable.
All current regulations on installing and commission-
ing flue systems have been observed.
2.
D
C
forwards
A
on base plate
along
D
F
1.
B
A
3. Secure ash box to the boiler with 2 tensioning tog-
gles
F
.
Installation sequence
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl3c

Table of Contents