Fitting the ash box
Note
Before inserting the ash box, attach the cover and lock
it with the tensioning toggles.
E
Fig. 19
1. Pull release pin
. Pull ash partition
B
until the release pin latches into place.
2. Push back ash box
C
guide rail
as far as it will go and to the right to
E
the boiler.
Connections on the flue gas side
Danger
Leaking or blocked flue systems, or an insuffi-
cient combustion air supply can cause life
threatening poisoning from flue gas and carbon
monoxide.
■
Ensure the flue system is in good working
order.
■
Apertures for combustion air supply must be
non-closable.
The system may only be commissioned once the fol-
lowing conditions are guaranteed:
■
Unrestricted flow in the flue gas routes.
■
Flue pipes are routed so that all casing panels are
accessible and can be removed for maintenance.
■
Flue systems are designed to be gas-tight.
Apertures for sufficient combustion air supply are
■
non-closable.
■
All current regulations on installing and commission-
ing flue systems have been observed.
2.
D
C
forwards
A
on base plate
along
D
F
1.
B
A
3. Secure ash box to the boiler with 2 tensioning tog-
gles
F
.
Installation sequence
27