03 MANUAL OPERATION
AC Breaker
L1
L2
L3
N
PE
DO port
SOC<60%
OFF
DO Relay
Inverter
BACKUP Load Control-OFF
(Three-Phase Load)
3.2.3 Battery Ready and Force Charge to Battery
Battery Ready(ETR)
Battery Ready function is a fee-based function, which is off by default. Contact the after-sales
service to pay for the function and obtain the series number. The after-sales service staff will
activate the battery-ready function. Connect the inverter to PV Master again after receiving an
activation notification from the after-sales service staff.
Tap Advanced Setting→Battery Setting to check the battery status.
Battery ready not activated
A1
DO+
A2
DO-
Load
User Manual V1.0-2021-06-15
Contactor
Battery ready activated
28