Load Control - Goodwe ET Series User Manual

Hybrid inverter
Hide thumbs Also See for ET Series:
Table of Contents

Advertisement

User Manual V1.0-2021-06-15
Log in using the initial password for the first time and change the password as soon as possible.
To ensure account security, you are advised to change the password periodically and keep the
new password in mind.
Steps to connect the WiFi:
Step 1: PV Master →Connect Device→Inverter with WiFi
Step 2: Phone Settings→WLAN→Solar-WiFi********
Step 3: PV Master→Solar-WiFi****
Follow the steps below to set basic settings.
PV Master→Settings→Basic Setting→Installer Password(goodwe2010)→Select Safety→Select
Work Mode→CT Detection

3.2.2 Load Control

The inverter is equipped with a dry contact relay, which helps turn the loads on or off when an
extra contactor is connected.
Note:
• The AC contactor should be placed between the inverter and the loads. Do not connect the load to DO
port directly.
• The contactor is not supplied by the manufacturer. Connect the the load to the DO port of the inverter
directly if the load is designed with a DI port.
• Maximum voltage and current at DO dry contact port: 250VAC 3A/30VDC 3A.
• When the controlled load is connected to ONGRID, the contactor coil must also be connected to
ONGRID. When the controlled load is connected to BACKUP, the contactor coil must also be connected to
BACKUP.
Tap Settings→Load Control to enter load control page and
select the working mode.
Working mode: Power Switch Mode, Time Mode and Backup
Load Control Mode.
Power Switch Mode
Turn on or off the loads via PV Master app directly.
• Select Power Switch Mode and tap ON. Once the inverter receives ON command, the
contactor will be connected and loads be powered on.
AC Breaker
L 1
L 2
L 3
N
PE
DO port
ON
DO Relay
Inverter
Power Switch Mode -ON
(Three-Phase Load)
A1
DO+
A2
DO-
Load
Contactor
25
03 MANUAL OPERATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents