Daily Checks - PROLEC Liftwatch Rail Operator's Manual

Rated capacity indicator
Table of Contents

Advertisement

9. Daily checks

9.1 Duty
Road / Rail / LUL duty
Place the machine in all its required duty configurations and confirm that the RCI reacts accordingly.
Remember to place the machine on appropriately canted rail to check Duty 2, 3 and 4 operations. This will
also confirm the correct operation of the AS7 Pitch and Roll (Cant) sensor.
See section 2.5 for duty numbering and icon descriptions.
Liftwatch Rail Operators Manual 560386-000 Issue 1.2 © Prolec Ltd - Feb 2011
Current duty sector highlighted
Duty indication
25 of 45

Advertisement

Table of Contents
loading

Table of Contents