PROLEC Liftwatch Rail Operator's Manual page 3

Rated capacity indicator
Table of Contents

Advertisement

PROLEC LIFTWATCH RAIL RATED CAPACITY INDICATOR FOR ROAD-RAIL EXCAVATORS
Model covered :
MODEL Ref
INTRODUCED
SYSTEM PART No.
Liftwatch Rail RCI system has been designed for compliance with RIS-1530-PLT Issue 2.
certification and documentation to confirm any limitations that may exist within the use of the machine and / or the RCI system.
DURING NORMAL OPERATION THE SWL OF A CRANE SHOULD NOT BE EXCEEDED. THEREFORE THE WARNING OF OVERLOAD
SHOULD NOT BE USED AS A NORMAL OPERATING FACILITY. IT SHOULD BE NOTED THAT CERTAIN STATUTORY
REQUIREMENTS DO NOT PERMIT THE SAFE WORKING LOAD TO BE EXCEEDED EXCEPT FOR THE PURPOSE OF TESTING
THIS RCI IS NOT SUITABLE FOR USE IN EXPLOSIVE ATMOSPHERES. ADJUSTMENT BY UNAUTHORISED PERSONS WILL INVALIDATE ANY
WARRANTY OR CERTIFICATION SUPPLIED. IF A PROBLEM ARISES WHICH CANNOT BE RECTIFIED USING THIS GUIDE, AUTHORISED
SERVICE SHOULD BE SOUGHT.
'Where a data logging system is found not to be operational then the vehicle shall not be used until the vehicle is repaired and fully confirmed as operational.
This requirement applies irrespective whether starting or part-way through an operation'.
Prolec supports a nationwide network of fully trained service engineers. Warranty claims, service work, technical information and spare parts are available
by contacting :
Prolec Ltd
25 Benson Road
Nuffield Industrial Estate
Poole Dorset BH17 0GB
Manufacturers original instructions
Liftwatch Rail Operators Manual 560386-000 Issue 1.2 © Prolec Ltd - Feb 2011
This guide describes the operation of the
LIFTWATCH RAIL
October 2010
002350-03X
Telephone +44 (0) 1202 681190
Fax
+44 (0) 1202 677909
Email
service@prolec.co.uk
IMPORTANT : Before use, check the machine
3 of 45

Advertisement

Table of Contents
loading

Related Products for PROLEC Liftwatch Rail

Table of Contents