2.3 I Operation

• Check that there are no tools or other foreign objects in the machine.
• The panel that provides access to the technical section must be put in place.
• Set the valves as follows: valve B wide open, valves A, C, D and E closed
• An incorrect by-pass setting may cause the heat pump to malfunction.
• Check that the hydraulic corrections are correctly tightened and that there are no leaks.
• Check that the appliance is stable.
• Set the water circulation running.
• Close valve B gradually so that the filter pressure is increased by 150g (0.150 bars).
• Open valves A, C and D fully then valve E by half (the air which has built up in the heat pump condenser and the
filtration circuit will bleed out). If valves D and E are not present, open valve A wide and close valve C by half.
• Connect the power supply to the heat pump.
• If the heat pump is on standby, press
screen is displayed. A 2-minute timer will start.
• Set the desired temperature (called the "setpoint", see § 2.4.2 "Adjusting the temperature setpoint").
After the start-up steps for your heat pump:
• Shut down the water circulation temporarily (by stopping the filtration or closing valve A or C) to check that your
appliance stops after a few seconds (via the activation of the flow switch).
• Reduce the setpoint temperature to below the water temperature to check that the heat pump stops operating.
• Switch off the heat pump by pressing and holding
: Water inlet valve
: By-pass valve
: Water outlet valve
: Water inlet adjustment valve (optional)
: Water outlet adjustment valve (optional)
for 3 seconds; the splash screen appears for 4 seconds then the home
for 3 seconds and check that it stops
EN
.