Orientation Agreements - ABB Terra AC User Manual

Hide thumbs Also See for Terra AC:
Table of Contents

Advertisement

About this document
Term
Contractor
Grid provider
Local rules
Open charge point proto-
col
Owner
Site operator
User
1.15

Orientation agreements

A
B
C
D
10
Note: It is possible that not all terms are present in this document.
B
Front side: face forward to the
EVSE during normal use
Left side
Right side
Rear side
Definition
Third party that the owner or site operator hires to do
engineering, civil and electrical installation work
Company that is responsible for the transport and dis-
tribution of electricity
All rules that apply to the EVSE during the entire lifecy-
cle of the EVSE. The local rules also include the national
laws and regulations.
Open standard for communication with charge sta-
tions
Legal owner of the EVSE
Entity that is responsible for the day-to-day control of
the EVSE. The site operator does not have to be the
owner.
Owner of an EV, who uses the EVSE to charge the EV
A
X
X-direction (positive is to the right)
Y
Y-direction (positive is rearward)
Z
Z-direction (positive is upward)
Z
Y
X
D
C
BCM.V3Y00.0-EN | 002 - DRAFT

Advertisement

Table of Contents
loading

Table of Contents