Regeneration Test; Recommended Maintenance Plan - Pentair FOLEO 5800 XTR Installer Manual

Hide thumbs Also See for FOLEO 5800 XTR:
Table of Contents

Advertisement

Installer manual Foleo 5800 XTR - Maintenance
8.1.3

Regeneration test

1. Check condition of brine tank and any associated equipment.
2. Check salt level in brine tank.
3. Initiate regeneration test.
ð Check brine draw during brine draw stage.
ð Check brine tank refill.
ð Check operation of safety brine valve, where fitted.
ð Check for brine draw off levels.
ð Check for resin loss at the drain during regeneration.
ð Where fitted, check for satisfactory operation of solenoid, i.e. outlet shut off during
regeneration and/or brine line shut off valve(s).
4. Test and record Total Hardness of outlet water from softener vessel(s).
8.2

Recommended maintenance plan

Items
Injector & filter
BLFC***
DLFC***
Bypass
(contains
Orings***)
Piston*
Seals &
spacers*
Brine valve
Check/clean/
replace if
necessary
O-rings***
Check for
watertightness
/clean or
replace in case
of leakage
Motor
Optical sensor
Gearing
Encoding
wheel
70 / 108
1 year
2 year
Clean
Clean
Clean
Clean
Clean
Clean
Clean
Clean
****
Replace
****
Replace
Check/clean/
replace if
necessary
Check for
watertightness
/clean or
replace in case
of leakage
Check
Check
Check
Check
Check
Check
Clean
Clean
3 year
4 year
Clean
Clean
Clean
Clean
****
Replace
****
Replace
Check/clean/
Check/clean/
replace if
replace if
necessary
necessary
Check for
Check for
watertightness
watertightness
/clean or
/clean or
replace in case
replace in case
of leakage
of leakage
Check
Check
Check
Check
Check
Check
Clean
Ref. MKT-IM-038 / E - 22.10.2021
5 year
Clean
Clean/ replace
if necessary
Clean
Clean/ replace
if necessary
Clean
Clean/ replace
if necessary
Clean
Clean/replace
if necessary
****
****
Check/clean/
replace if
necessary
Check for
watertightness
/clean or
replace in case
of leakage
Replace
Replace
Check/ replace
if necessary
Clean
Clean

Advertisement

Table of Contents
loading

Table of Contents