Operation - Siruba ASK-ASM100 Instruction Book / Parts List

Table of Contents

Advertisement

OPERATION

1. Power and Air Pressure
(1) Main Power
Rate Power Supply AC
220V±10%。 Must be
grounded。
(2) Air Supply Setting
0.5Mpa (5kg/c ㎡ )。
2. To upload the material
Insert the rib cuff into the fleece
sleeve (seam facing outward).
Align the edges and make sure
the seams are overlapped. Then
load the material onto the sewing
machine to the stopper.
Edges
SEAM
Rib Cuff
Fleece Sleeve
Stopper
P11

Advertisement

Chapters

Table of Contents
loading

Table of Contents