Lenovo ThinkSystem SR950 Setup Manual page 305

Hide thumbs Also See for ThinkSystem SR950:
Table of Contents

Advertisement

Complete the following steps to install an adapter for slot 5 to 8.
Watch the procedure. A video of the installation process is available:
YouTube
Youku
Figure 72. Adapter installation (slot 5 to 8)
Step 1.
Align the adapter with the I/O tray slot and insert it; then, press the adapter into the I/O tray until the
connector is fully seated.
If you have no other operations to perform on the I/O tray after installing an adapter in slot 5 to 8:
1. If any of the adapters in the I/O tray have internal cables, make sure that they are connected before
installing the I/O tray.
2. Install the riser or riser filler for slot 1 to 4 (left riser). See "Install the riser for slot 1 to 4 (riser 1)" on page
364.
3. Install the I/O tray in the chassis and connect all cables. See "Install the I/O tray" on page 335.
Install a LOM adapter in slot 9
The LOM adapter in slot 9 is in the I/O tray that is accessed from the rear of the server. With the I/O tray
removed from the chassis, insert the adapter in the I/O tray.
S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
Appendix B. Component reference
301

Advertisement

Table of Contents
loading

Table of Contents