Part 12 - Installation Checklist

Part 1 - General Safety Information
Wiring
Has the power and control been wired per boiler wiring diagram, this manual?
Is the main electrical connection polarity within boiler requirements?
Does the power supply voltage agree with the boiler rating plate? 120V AC?
Start-Up, Adjust, and Test
Has the boiler been started?
If necessary, has the boiler gas valve been adjusted?
Has the installation been customized per installation location requirements?
Have all customized system parameters been tested?
Has proper boiler operation been confirmed?
Burner Flame
Has the burner flame been checked?
Have combustion values been verified with a calibrated combustion analyzer?
If the flame does not appear normal, it may need to be cleaned by a qualified service technician. See flame
sight glass window location.
Final Installation Approvals
Table 33 - Installation Checklist
82
Signed by Technician
Yes
Note
Yes
Note
Yes
Note
Date