Steering System Installation; Mounting Harnesses - Raven CRX Installation Manual

Hide thumbs Also See for CRX:
Table of Contents

Advertisement

STEERING SYSTEM INSTALLATION | CRX + RS1 | RAVEN EUROPE GENERIC

1 STEERING SYSTEM INSTALLATION

This chapter describes the installation of all the
different steering systems, hydraulic and SmarTrax MD.
Look carefully at the system overviews to know which
parts of the installation are applicable.

MOUNTING HARNESSES

When installing an autosteer system, the power cables
should always be connected to the battery. Two
options are possible, a Basic Harness (1-115-8000-141)
or an Implement Ready Harness (1-115-8000-060
frontmount or 1-115-8000-315 midmount). The
differcence between these harnesses is the IBBC
connector, this one is included at an Implement Ready
(IR) Harness (Figure 1) .
Power harness: an Implement Ready power harness is
mounted from the battery to the rear of the tractor. A
Basic power harness is mounted from the battery to
the chassis harness. Make sure that the relays and
fuses are mounted in a dry, clean and accessible spot
(Figure 2).
Which harness will be connected to the Power Harness
depends on which type of steering will be installed.
In addition, a number of guidelines have been
established for the assembly of all types of cable
harnesses:
Mount the relays fixed and in a dry, clean and
accessible spot (Figure 2).
The red wire is + (12V). The black wire is minus
(ground). Make sure that the first part of the
red wire (part in between battery and fuses)
cannot damage during operation.
If necessary the positive and negative wires, in
between the battery and the fuses, can be
shortened. Be sure to use cable sockets with
the correct size for proper connection.
Raven Industries Inc.
FIGURE 2 CORRECT MOUNTED RELAYS AND FUSES
PAGE 12/35 | Installation manual | 016-8000-028EN | Rev. A1
FIGURE 1 IBBC CONNECTOR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs1

Table of Contents