Graco E-Flo Installation Manual page 26

Iq dispense system
Table of Contents

Advertisement

Installation
F
. 14: Remove the Power Junction Box Cover
IG
4. Insert the power cord through the cord grip and into
the Power Junction Box (AJ).
F
. 15: Power Connection
IG
5. Attach the ground wire to the ground lug inside the
Power Junction Box (AJ).
6. Refer to F
. 16 and connect the wires from the
IG
power cord into terminals 4T2 and 6T3 on the Dis-
connect Switch terminal block.
F
. 16: Disconnect Switch Terminal Block
IG
NOTE: Use a flat-head or Pozidriv screwdriver to tighten
the terminals to 7-10 in-lb (0.8-1.1 N•m).
7. Tighten the cord grip to securely hold the power
cord to the Power Junction Box (AJ).
8. Replace the Power Junction Box cover and secure it
with the six screws that were removed in step 2.
26
AJ
Screws
Ground Lug
Disconnect Switch
Terminal Block
Cord Grip
Heated Systems
1. Turn the Heat Control Box Disconnect Switch (AZ)
OFF.
SR
350
F
. 17
IG
2. Loosen the screws and remove the cover (350) on
the Heat Control Box (AX).
3. Insert the electrical cord through the electrical
enclosure strain relief bushing (SR).
4. Attach insulated ferrules to the end of each wire.
5. Connect the ground wire to the ground stud (GS).
6. Connect power wires to the Heat Control Box Dis-
connect Switch (AZ) as shown below.
NOTE: Use a flat-head or Pozidriv screwdriver to tighten
the terminals to 7-10 in-lb (0.8-1.1 N•m).
7. Tighten the strain relief bushing (SR) around the
electrical cord.
8. Close the Heat Control Box door (350).
GS
AZ
ti31214a
333586E

Advertisement

Table of Contents
loading

This manual is also suitable for:

333586e

Table of Contents