Open the capture file and observe the captured synchrophasor data. In order to get the Phasor
names on top of each column (See figure 16), the capture process should start before connecting
the PMU Connection Tester to the PMU, i.e. first start the capturing and then click Connect.
Line differential protection RED670
Commissioning manual
Stop capturing the IEEE C37.118 synchrophasor data