1MRK 505 378-UUS Rev. J
Test of function operation for intermittent EF
1.
Change the following settings from the default values:
2.
Inject manually the following analogue quantities given in secondary amperes and volts but only for
100ms (in order to avoid STFW signal which is delayed for 150ms):
IN
UN
3.
Within the reset time (that is 5s with above setting) re-apply the above quantities again for 100ms
and repeat this step for at least the same number of times as set under setting UN>StartsNo (at
least 4 times with above settings).
4.
The following signals are given from the APPTEF function:
11.5.16.2
Completing the test
Continue to test another function or end the test by navigating to Main menu/Test/IED test mode/
TESTMODE: 1 and change the IEDTestMode setting to Off. Restore connections and settings to their
original values, if they were changed for testing purposes.
11.6
Voltage protection
11.6.1
Two step undervoltage protection UV2PTUV (27)
Prepare the IED for verification of settings as outlined in section
for test"
in this chapter.
11.6.1.1
Verifying the settings
Verification of pickup value and time delay to trip for Step 1
Line differential protection RED670
Commissioning manual
OperationMode = Start and Trip in order to obtain the trip signal
IN>=5% (default value)
IMinForward=2.5% (use the default value)
UN>StartsNo=4 (default, but it can be changed if required)
tReset=5.0s (set maximum value in order to make the test process easier)
STUN at the beginning of every injection period of 100ms.
WRNFW at the beginning of every injection period of 100ms
STFW and STIEF appear after the fourth injection period of 100ms (when UN>StartsNo =4
as set above)
TRIP comes after 2s (set tTrip time) after the STFW signal has appeared
The dead time between two set injection pulses of 100ms is less than the set
tReset time, otherwise the function does not operate.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
GUID-ADDA3A73-9884-41B1-96D0-EE9653004E96 v1
Magnitude=75mA; Angle=180 degrees
Magnitude=100V; Angle=0 degrees
GUID-FEA7B2D1-3F4A-43FD-98F8-EC3584E5B511 v1
"Requirements"
and section
Section 11
SEMOD53540-1 v1
M13796-2 v6
"Preparing
M13796-9 v3
M13796-29 v11
191