Section 11
Testing functionality by secondary injection
Tinv
ANSIEQUATION2403 V2 EN-US
6.
Compare the result with the expected value.
The expected value depends on whether definite or inverse time was selected.
7.
Continue to test another function or complete the test by setting the test mode to Disabled.
Operation mode 3I
1.
Set the polarizing voltage to 1.2 · VNRelPU and set the phase angle between voltage and current
to the set characteristic angle (RCADir). Note that the current lagging the voltage.
2.
Inject current until the function picks up, and make sure that the trip current is equal to the INRelPU
setting for the set directional element.
The function activates the PICKUPand PUDIRIN output.
Measure with angles j around RCADir +/- ROADir.
3.
4.
Compare the result with the set values, refer to figure
5.
Measure the trip time of the timer by injecting a current to get two times the set SN_PU trip value.
Tinv
ANSIEQUATION2403 V2 EN-US
6.
Compare the result with the expected value.
The expected value depends on whether definite or inverse time was selected.
7.
Continue to test another function or complete the test by setting the test mode to Disabled.
ANSI06000652 V2 EN-US
Figure 46:
170
=
TDSN SRef 3
3
I
V
0
test
0
and φ
0
Note that for pickup, both the injected current and voltage must be greater than the
set values INRelPU and VNRelPU respectively.
=
TDSN SRef 3
I
3
V
0
0
test
Example characteristic
© 2017 - 2021 Hitachi Power Grids. All rights reserved
( )
cos ϕ
test
46
( )
cos ϕ
test
RCA = 0º
ROA = 80º
Operate area
3I
0
V
ref
ANSI06000652-2-en.vsd
1MRK 505 378-UUS Rev. J
for example characteristic.
=-3V
0
Line differential protection RED670
Commissioning manual
(Equation 81)
SEMOD175060-87 v8
(Equation 82)

Advertisement

Table of Contents
loading

Table of Contents