ABB RED670 Commissioning Manual page 70

Line differential protection
Hide thumbs Also See for RED670:
Table of Contents

Advertisement

Section 8
Establishing connection and verifying the IEC 61850 communication
that other signal is shown as Ok. Be sure to re-connect the removed connection after completed
verification.
64
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1MRK 505 378-UUS Rev. J
Line differential protection RED670
Commissioning manual

Advertisement

Table of Contents
loading

Table of Contents