Section 11
Testing functionality by secondary injection
To test
set
-
ANSI04000202 V2 EN-US
Figure 54:
11.10.2.1
Preparation of the verification
1.
Check the function settings on the local HMI under Main menu/Settings /IED Settings/Control /
Autorecloser79,5(0–>1)/SMBRREC:x(79,5(0–>)):x
If any timer settings are reduced to speed up or facilitate the testing, they shall be set to normal
after testing. A temporary label on the IED can be a reminder to restore normal settings after which
a verification test should be performed.
2.
Decide if a synchrocheck function SESRSYN (25) shall be included in the test.
224
BI
BI
ST
SRY
Simulating the CB operation by a bi-stable relay/breaker simulator and manual
switches
© 2017 - 2021 Hitachi Power Grids. All rights reserved
SC
BR
ANSI04000202-1-en.vsd
1MRK 505 378-UUS Rev. J
Line differential protection RED670
Commissioning manual
M12400-40 v8

Advertisement

Table of Contents
loading

Table of Contents