11.4.7.4
Measuring the operating time of distance protection zones
Procedure:
1.
Subject the IED to healthy normal load conditions for at least two seconds.
2.
Apply the fault condition to find the operating time for the phase-to-phase fault according to test
point 12 for zone 1. Compare the result of the measurement to the setting tPPZ1.
3.
Repeat steps
12. Compare the result of the measurement to the setting t1PG.
4.
Repeat steps
The zones that are not tested have to be blocked and the zone that is tested has to be released.
11.4.7.5
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.4.8
High Speed distance for series compensated line zones,
quadrilateral and mho characteristic ZMFCPDIS (21)
Prepare the IED for verification of settings outlined in Section
11.4.8.1
Function revision history
Document
revision
A
B
C
D
E
F
G
H
J
11.4.8.2
Verifying the settings
Measure operating characteristics during constant current conditions. Keep the measured current as
close as possible to its rated value or lower. But make sure it is higher than the set minimum operating
current.
Line differential protection RED670
Commissioning manual
1
to
2
to find the operating time for the phase-to-ground fault according to test point
1
to
2
to find the operating time for all other used measuring zones.
Product
History
revision
2.2.1
Impedance measurement and supervision added (ZMMXU).
2.2.1
-
2.2.2
-
2.2.3
Transient directional (TD) element added, with associated input and outputs.
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
Zone BU (Backup) is added. Now there are seven zones in total. Zone 2 direction and
directional blinders (ArgDir, ArgNegRes) are now settable. Setting tTauDC is added; a
parameter for optional fine tuning of performance.
Added new setting RStart, which limits the resistive reach of the phase selection outside of
the ArgLd sector. Changed setting name XLd to XStart.
2.2.5
Parallel line mutual coupling compensation feature based on the parallel line residual current
is added with new settings: EnaPar, INPRatio, R0MZ1, X0MZ1, R0MZ2, and X0MZ2.
Load compensation and direction element are improved for earth faults without zero
sequence current condition.
This update is valid for all the previously released 2.2 products.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
GUID-BB93C603-F43E-40CB-8EFA-3B0F280C011D v6
GUID-60C5389E-B021-45BB-8CB3-E21348CF50EF v2
GUID-EE954483-7157-4EA2-A5DD-537DF6864BC2 v5
"Preparing the IED to verify
GUID-96705EE1-C538-4737-AAE9-141287810AAE v3
GUID-1F9FCB40-D43B-48CC-AFD4-2164D04FDCEA v1
Section 11
settings".