ABB RED670 Commissioning Manual page 131

Line differential protection
Hide thumbs Also See for RED670:
Table of Contents

Advertisement

1MRK 505 378-UUS Rev. J
Table 33:
Test point
1
2
3
4
5
6
7
8
9
10
11
12
13
Table is used in conjunction with figure .
Line differential protection RED670
Commissioning manual
Test points for phase-to-phase loops A-B (Ohm/Loop)
Reach
Set value
X
X1
set
R
0
X
X1
set
R
R1
set
X
0.8 x X1
set
R
0.8 x R1
+ RFPPZx/2
set
X
0.5 x X1
set
R
0.5 x R1
+ RFPPZx/2
set
X
0.85 x RFPPZx x tan (LdAngle)
R
0.85 x RFPPZx
X
RLdFwd x tan (LdAngle)
R
RLdFwd
X
RLdFwd x tan (LdAngle)
R
0
X
–0.2143 x RFPPZx/2
R
0.8 x RFPPZx/2
X
–0.4 x RLdFwd x tan(ArgDir=20°)
R
0.4 x RLdFwd
X
0.5 x X1
set
R
–0.23 x X1
set
X
0.8 x X1
set
R
–0.37 x X1
set
X
0.5 x X1
set
R
0.5 x R1
set
X
0
R
0.5 x RFPPZx
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
Comments
LdAngle = angle for the maximal load transfer
Exact: 0.8 x RFPPZx/2 (ArgDir=20°)
Exact –0.5 x R1
x tan(ArgNegRes=30°)
set
Exact –0.5 x R1
x tan(ArgNegRes=30°)
set
Section 11
125

Advertisement

Table of Contents
loading

Table of Contents