ABB RED670 Commissioning Manual page 235

Line differential protection
Hide thumbs Also See for RED670:
Table of Contents

Advertisement

1MRK 505 378-UUS Rev. J
Activation of the different zones verifies that the CS signal is issued from the intended zones. The CS
signal from the independent tripping zone must have a tSendMin minimum time.
Check the tripping function by activating the CR and CR_GUARD inputs with the overreaching zone used
to achieve the PLTR_CRD signal.
It is sufficient to activate the zones with only one type of fault with the secondary injection.
11.11.1.1
Function revision history
Document
revision
B
C
D
E
F
G
H
J
K
L
M
11.11.1.2
Testing permissive underreaching
1.
Activate the receive (CR) signal in the IED.
2.
Apply healthy normal load conditions to the IED for at least two seconds.
3.
Apply a fault condition within the permissive zone.
4.
Check that correct trip outputs, external signals, and indications are obtained for the actual type of
fault generated.
5.
Check that other zones operate according to their zone timers and that the send (CS) signal is
obtained only for the zone configured to generate the actual signal.
6.
Deactivate the receive (CR) signal in the IED.
7.
Check that the trip time complies with the zone timers and that correct trip outputs, external signals,
and indications are obtained for the actual type of fault generated.
11.11.1.3
Testing permissive overreaching
1.
Activate the receive (CR) signal in the IED.
2.
Apply healthy normal load conditions to the IED for at least two seconds.
3.
Apply a fault condition within the permissive zone.
4.
Check that correct trip outputs, external signals, and indication are obtained for the actual type of
fault generated.
Line differential protection RED670
Commissioning manual
Product
History
revision
2.2.1
-
2.2.2
-
2.2.2
2.2.2
-
2.2.3
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
2.2.5
Added separate DOs for teleprotection permissive (TxPrm & RxPrm1), blocking (TxBlk &
RxBlk1) and direct trip (TxTr & RxTr1) transmit and receive signals in accordance with 61850
Ed 2.0.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Section 11
Testing functionality by secondary injection
GUID-E8271DE5-A605-432C-8608-F8DEEF97D4F0 v1
M13868-10 v4
M13868-28 v4
229

Advertisement

Table of Contents
loading

Table of Contents