1MRK 505 378-UUS Rev. J
ANSI07000106 V2 EN-US
Figure 47:
where:
1
2
3.
Decrease slowly the voltage in phase VA of the test set until the PICKUP signal resets.
4.
Check V1 blocking level by comparing the voltage level at reset with the set undervoltage blocking
V1Low.
5.
Repeat steps
Check of V2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 48.
Line differential protection RED670
Commissioning manual
VA
VB
VC
VN
Connection of the test set to the IED for test of V1 block level
is three-phase voltage group1 (V1)
is three-phase voltage group2 (V2)
2
to
4
to check V1Low for the other phases.
The connections to V1 must be shifted to test another phase. (VA to VB, VB to VC,
VC to VA)
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
VA
VB
1
VC
VN
VA
2
VB
VC
ANSI07000106-1-en.vsd
Section 11
SEMOD175258-91 v3
197