Installing Vertical Stabilizer - Seagull Models MAULE SUPER ROCKET 15CC Assembly Manual

Hide thumbs Also See for MAULE SUPER ROCKET 15CC:
Table of Contents

Advertisement

6) Using a modeling knife, carefully re-
move the covering that overlaps the sta-
bilizer mounting platform sides in the
fuselage. Remove the covering from both
the top and the bottom of the platform
sides.
7) When you are sure that everything is
aligned correctly, mix up a generous
amount of 30 Minute Epoxy. Apply a thin
layer to the top and bottom of the stabi-
lizer mounting area and to the stabilizer
mounting platform sides in the fuselage.
Slide the stabilizer in place and realign.
Double check all of your measurements
once more before the epoxy cures. Hold
the stabilizer in place with T-pins or mask-
ing tape and remove any excess epoxy us-
ing a paper towel and rubbing alcohol.
WWW.SEAGULLMODELS.COM
Epoxy
.
.
Epoxy

INSTALLING VERTICAL STABILIZER

1) Using a modeling knife, remove the
covering from over the precut hinge slot
cut into the lower rear portion of the fu-
selage. This slot accepts the lower rudder
hinge.
Remove covering.
Fill Epoxy
2) Slide the vertical stabilizer into the slot in
the top of the fuselage. The rear edge of the
stabilizer should be flush with the rear edge
of the fuselage and the lower rudder hinge
should engage the precut hinge slot in the
lower fuselage. The bottom edge of the stabi-
lizer should also be firmly pushed against the
top of the horizontal stabilizer.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea232

Table of Contents