Commissioning Of The Smartwire-Dt Netwerk - Eaton XV-102 Operating Instructions Manual

Micro panel
Hide thumbs Also See for XV-102:
Table of Contents

Advertisement

5.3.8.5

Commissioning of the SmartWire-DT netwerk

Switching on for initial commissioning, after a replacement or after a changed SmartWire-DT
configuration
Requirement:
All SmartWire-DT slaves are connected by SmartWire-DT cables.
The SmartWire-DT netwerk is connected to the SWD interface.
The power supply for the device and for SmartWire-DT is applied.
The POW LED of the SmartWire-DT Master interface lights up.
The SmartWire-DT status LEDs on the connected SmartWire-DT slaves are flashing or lit.
A PLC project with configured SWD-Master exists (project configuration).
The PLC runtime system is installed on the device.
Procedure:
1
Press the configuration button «Config» for at least two seconds.
The SWD LED of the SmartWire-DT Master interface begins to flash orange and the
SmartWire-DT status LEDs on the connected SmartWire-DT slaves flash.
The SWD LED of the SmartWire-DT Master interface begins to flash green.
All SmartWire-DT slaves are addressed.
The physical structure of the SmartWire-DT network is stored retentively in the device as the
target configuration.
The SWD LED of the SmartWire-DT Master interface lights up green.
2
Download the PLC project (XSoft-CoDeSys-2) onto the device.
If the project configuration is identical to the stored target configuration, the Config LED lights
up green and the data exchange of the input and output data can start.
XV-102 Micro Panel MN04802004Z-EN—February 2013 www.eaton.com
www.comoso.com
5 Installation
5.3 Interfaces
37

Advertisement

Table of Contents
loading

Table of Contents