Tape Drive - Lenovo ThinkSystem ST250 Setup Manual

Hide thumbs Also See for ThinkSystem ST250:
Table of Contents

Advertisement

Tape drive

Use the section to understand the cable routing for the tape drive.
SAS tape drive
Figure 21. Cable routing for the SAS tape drive
Cable
Signal to power
1
cable
Power cable
2
Signal cable with
3
power
Note: Ensure that all cables are routed through the correct cable clips.
From
Power connector on tape drive
Power connector on power cable
Signal connector on tape drive
To
Power connector on power cable
Optical drive power connector on system
board
An available connector on the HBA adapter
.
Chapter 2
Server components
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

7y457y46

Table of Contents