Lenovo ThinkSystem ST250 Setup Manual page 77

Hide thumbs Also See for ThinkSystem ST250:
Table of Contents

Advertisement

Before installing the hot -swap power supply,
1. Watch the procedure. A video of this procedure is available from the following links:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Dy5N2dPXFx5Pht-FljAi6S
• Youku:
https://list.youku.com/albumlist/show/id_51977169
2. Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
To install the hot-swap power supply, complete the following steps:
Step 1.
If there is a power-supply-bay filler installed, remove it.
Important: To ensure proper cooling during normal server operation, both of the power supply
bays must be occupied. This means that each bay must have a power supply installed; or one has
a power supply installed and the other has a power-supply filler installed.
Figure 51. Hot-swap power supply filler removal
Step 2.
Note the orientation of the hot-swap power supply, and then slide it into the chassis until it snaps
into position.
.
Chapter 3
Server hardware setup
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

7y457y46

Table of Contents