Completing The Installation; Completing The Installation Of A New System - Enterasys Matrix 7H4382-25 Hardware Installation Manual

Dfe-platinum series
Hide thumbs Also See for Matrix 7H4382-25:
Table of Contents

Advertisement

Completing the Installation

Modem Port Adapter Wiring and Signal Diagram
RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completing the DFE‐Platinum module installation depends on if the module is being 
installed in:
a new DFE‐Platinum module system (refer to "Completing the Installation" on 
page 3‐22), or
an established, operating DFE‐Platinum module system (refer to "Completing the 
Installation of a DFE‐Platinum Module in an Existing System" on page 3‐24).

Completing the Installation of a New System

In a new system of DFE‐Platinum modules, one of the installed DFE‐Platinum modules 
will become the management module on chassis power up, and all DFE‐Platinum 
modules will automatically be set to the factory default values. A complete list of the 
factory default values are provided in Chapter 3 of the Enterasys Matrix DFE‐Platinum 
Series Configuration Guide.
After installing all DFE‐Platinum modules into the host chassis and making the 
connections to the network, proceed to the following First‐Time Log‐In Using a Console 
Port Connection procedure to access the module management startup screen from your 
PC, terminal, or modem connection.
3-22 Installation
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator

Advertisement

Table of Contents
loading

Table of Contents