A-1 Unpacking - Omron HD-1500 Platform User Manual

Hide thumbs Also See for HD-1500 Platform:
Table of Contents

Advertisement

Appendices

A-1 Unpacking

The fully assembled AMR, Power Supply Box, Docking Target, and battery are packed and shipped in
separate crates. Any optional devices or accessories purchased with the AMR are packed in a carton
and placed in the main crate containing the AMR. Use the information in this section to understand the
unpacking information for the AMR and other components supplied with the system.
• Follow all unpacking safety instructions and use appropriate tools and equipment.
Failure to do so could result in personal injury or property damage.
• Use safe lifting practices when moving the heavy objects such as the Power Supply
Box, Battery, Docking Target, and AMR.
• At least 3 people are required to lift the battery.
• You must wear proper Personal Protective Equipment (PPE) for removing, instal-
ling, and lifting the battery or when working around a leaking battery.
A pallet jack, overhead hoist, or forklift used to lift the AMR and Power Supply Box
shipping crates must be rated for at least 1100 kg.
Precautions for Safe Use
It is the end user's responsibility to ensure that the person operating the lifting device has suc-
cessfully completed the required training and is certified to operate these machines.
Precautions for Correct Use
IATA regulations (UN 3480, PI 965) require that air freight shipped lithium ion batteries must be
transported at a state of charge not exceeding 30%. To avoid total discharge, fully charge the
battery immediately upon receipt. The battery might arrive fully charged if it is not shipped by air
freight.
Make the following considerations before unpacking the equipment.
• Carefully inspect all shipping boxes and crates for evidence of damage during transit. If any damage
is indicated, request that the carrier's agent be present at the time the crate is unpacked.
• Before signing the carrier's delivery sheet, compare the actual items received with your equipment
purchase order. Verify that all items are present and that the shipment is correct and free of visible
damage.
If the items received do not match the packing slip or have been damaged, do not accept the deliv-
ery.
If the items received do not match your order, contact your local OMRON representative.
• Retain the containers and packaging materials. These items may be necessary to settle claims or to
relocate the equipment at a later date.
• Make sure you have 7 m of clear working space in front of the AMR shipping crate for unloading
purposes. You should also have 2 m of clear space behind the AMR shipping crate to allow the
crate to be pushed back.
A-2
WARNING
WARNING
HD-1500 Platform User's Manual (I645)

Advertisement

Table of Contents
loading

Table of Contents