Required Inspection-points
Inspect the general condition of the
1
heating system & its components
Test functions of all the demands
2
wired into the product
3 C heck gas system for leaks
4 C heck plumbing system for leaks
Verify product chasis ground
5
through continuity check with volt
meter
Verify external expansion tank
6
diaphram pressure (If installed)
C heck / C lean Water Filter /
7
Strainers
8 C lean combustion chamber
C heck flame sensor & direct spark
9
electrodes for wear, correct gap
Verify drainage of condensation
10
trap system (internal & external)
11 Test no-gas / ignition safety
12 Test low-pressure alarm
Test water quality - verify meets
13
requirements of product manual
14 Test burner combustion
C heck venting system for wear,
15
leaks, cracks, obstructions
A Burner Reading C O - MAX Fire
B Burner Reading C O2 - MAX Fire
C Burner Reading C O - MIN Fire
D Burner Reading C O2 - MIN Fire
E Inlet Gas Pressure Reading
F
Water pH Readng
Inspectors Name
C ontractors C ompany Name
C ompany Phone Number
Inspector Signature
syncFURNACE OD Instruction & Installation Manual – Rev 09
Year 6
Year 7
Dat e:
Dat e:
Year 8
Year 9
Dat e:
Dat e:
Year 10
Dat e:
Pg. 71 of 81