Chapter 3: 6C105 Setup
3.2
SETTING UP THE 6C105
The following sections describe the procedures that must be followed to
complete the installation of the 6C105.
3.2.1
Installation Order
Once a suitable site has been chosen, the 6C105 can be installed. The
chassis can be freestanding or rack mounted.
It is recommended that the 6C105 installation proceed in this order:
1.
Install the cable management bar.
2.
Mount the chassis to a 19-inch rack or other secure location.
3.
Attach the Electrostatic Discharge Wrist Strap.
4.
Install the Power Supply Module(s).
5.
Install the Interface Modules.