Assembly And Set Up - Baileigh Industrial SBR-5216 Operator's Manual

3-in-1 combination shear, brake, roll
Table of Contents

Advertisement

ASSEMBLY AND SET UP

1. This machine comes with one long (39.5"
[1003mm]) and one short (31.5" [800mm])
handlebars. It is the owners/operators choice as to
which end of the machine the handlebars are
installed into.
2. Remove the swivel handle (52) from the handlebar.
3. Loosen the thumb bolt, (11) enough to allow the
handlebar to slide into the hub.
4. Extend the handlebar though the hub enough to allow the swivel handle to be installed.
5. Tighten the thumb bolt (11) to hold the handlebar in position.
6. Install and tighten the swivel handle (52) to prevent the handlebar from coming out of the
hub and to provide the handle for pulling the machine during operation.
Note: Do not overtighten the thumb bolt. The handlebar is typically slide from the
center position to full extension as the material increases toward full capacity.
7. Repeat this procedure at the other end of the machine with the other
handlebar.
8. Thread the upper roll adjusting knobs into the tapped holes on the
top of each side plate as shown.
9. Tighten the knobs until just snug.
10. Thread both back stop extension rods (#28) into the lower set of holes
as shown. These holes are located on the outfeed side of the casting.
Note: With the back gauge (33) is on the to of the rods, the
back gauge will be aligned for use with the brake. When the back gauge is
below the rods the back gauge will be aligned for use with the shear.
11. Fasten both mounting collars (#29) to the back gauge (#33). The stand
dies can now be positioned where needed on the long rods to locate
the back gauge.
28
19
19
11
52
33
29

Advertisement

Table of Contents
loading

Table of Contents