Rolling Operation - Baileigh Industrial SBR-5216 Operator's Manual

3-in-1 combination shear, brake, roll
Table of Contents

Advertisement

Rolling Operation

1. Back off the idler roll by turning the two adjustment bolts counterclockwise (ccw) as in view
"A" below.
2. Unscrew the top roll adjustment bolts until there is enough gap between the top and bottom
rolls to allow the piece part to fit between.
3. Rotate the handlebar to advance the piece part about 1" (25.4mm) beyond the rolls.
4. Tighten the top roll adjustment bolts to hold the piece part firmly.
5. Raise the idler roll enough to get the material started in an upward direction against the top
front roll as shown in view "B.
Idler Roll
Adjustment
Bolt
6. Rolling the initial edge slightly will give it a pre-bend.
7. Back the piece out, turn the piece part and repeat the sequence for the other end. See view
"C" below.
consistent gap
Top Roll
Adjustment
Bolt
A
piece part
Handlebar
Rotation
31
31
B

Advertisement

Table of Contents
loading

Table of Contents