Specifying The I 2 C Initialization Sequence - Texas Instruments TAS3308EVM User Manual

Evaluation module for the tas3308 digital audio signal processor
Table of Contents

Advertisement

TAS3308 Software Installation
Then verify that the "Execute on reset" box is checked.
At this point a process flow can be built using the TAS3308 application framework, the TAS3308 I/O
components and the audio processing components.
Building and running a process flow
A good starting point is to load the predefined TAS3308 Test process flow.
This flow is loaded by selecting File/Open.
18
Quick Setup Guide
Figure 2-3. Specifying the I
2
C Initialization Sequence
www.ti.com
SLEU093 – March 2008
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS3308EVM and is the answer not in the manual?

Table of Contents