www.ti.com
The input selection is performed by selecting the Mux and changing the Mux Select Property to StereoCh1
or StereoCh2.
To build this process flow and execute it on the EVM, select Build/ Generate Code, then Build/Download
code, and finally then Build/Run.
When the GDE transitions to run mode, the GDE resets the TAS3308EVM.
The reset restores the TAS3308 register to the default values.
The TAS3308 will then load the EEPROM image and the TAS3308_init_master/slave.cfg file.
At this point the TAS3308 EVM transitions to the run mode with the mute in the ON state.
For the TAS3308 to stream audio out of the DAC outputs, the mute must be returned to the inactive state.
This is done by pressing the mute button. The mute LED is extinguished.
For more advanced use of the GDE please refer to GDE online help, GDE Release notes and TAS3108
MCU Programmer's Reference Guide.
SLEU093 – March 2008
Submit Documentation Feedback
Figure 2-6. GDE Test Process Flow
TAS3308 Software Installation
Quick Setup Guide
21
Need help?
Do you have a question about the TAS3308EVM and is the answer not in the manual?