Electrostatic Discharge Warning; Unpacking The Evm; Power Supply Setup; Digital Audio Inputs/Outputs - Texas Instruments TAS3308EVM User Manual

Evaluation module for the tas3308 digital audio signal processor
Table of Contents

Advertisement

Electrostatic Discharge Warning

2.1
Electrostatic Discharge Warning
Many of the components on the TAS3308EVM are susceptible to damage by electrostatic discharge
(ESD). Customers are advised to observe proper ESD handling precautions when unpacking and handling
the EVM, including the use of a grounded wrist strap at an approved ESD workstation.
Failure to observe ESD handling procedures may result in damage to EVM
components.
2.2

Unpacking the EVM

Upon opening the TAS3308EVM package, please check to make sure that the following items are
included:
• TAS3308EVM board using one TAS3308DCP (1 pc.)
• PurePath CD-ROM containing data sheets, application reports, user guides, Gerber files, and PC
software tools (1 pc.)
If any of these items are missing, please contact the Texas Instruments Product Information Center
nearest you to inquire about a replacement.
2.3

Power Supply Setup

The TAS3308EVM is powered via the ±9 V terminals or the 9 V (center hot) power connectors, PJ1 and
PJ2. The TAS3308 EVM generates a 5-V, –5-V, and 3.3-V internal supplies that are fed to the
TAS3308EVM components.
Set the power supplies to ±9 V. Then turn off the supplies and them to the EVM.
Once the cables are connected, switch on the power supply. Current consumption should be less than
shown in
Table
2-1, if higher switch off and double check the cabling.
Description
9 V
–9 V
Applying voltages above the limitations given in
permanent damage to your hardware.
2.4

Digital Audio Inputs/Outputs

The digital audio inputs can be connected to the board in two ways, either in the SPDIF format optical
TOSLINK input, OPTO1, or in I
shown in Chapter 3.
2
The SPDIF I
S IN input supplies signal to the TAS3308 SDIN1. When a valid lock is detected by the
DIR9001 SPDIF receiver a blue SPDIF lock LED is lit.
14
Quick Setup Guide
Table 2-1. Recommended Supply Voltages for EVM Board
Voltage Limitations
8.5 V – 9.5 V
–8.5 V – 9.4 V
2
S format on connector J1. The pin out this and the other connectors is
CAUTION
CAUTION
Table 2-1
www.ti.com
Current Requirement
0.3 A
0.1 A
may cause
SLEU093 – March 2008
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS3308EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents