Gde Startup; Setting The I 2 C Initialization Sequence - Texas Instruments TAS3308EVM User Manual

Evaluation module for the tas3308 digital audio signal processor
Table of Contents

Advertisement

www.ti.com
The startup of GDE takes few seconds.
The TAS3308 requires an initialization configuration file to be loaded after a reset. This file configures the
TAS3308 for the EVM configuration, enables the analog outputs, and sets the clock master/slave mode.
Before loading or building a process flow verify that an initialization file is specified in the Execute I
command file window. This window is found under Tools/I
If the EVM is to be operated in Master mode, select 3308EVM_init_master.cfg.
If the EVM is to be operated in Slave mode, select 3308EVM_init_slave.cfg.
SLEU093 – March 2008
Submit Documentation Feedback
Figure 2-1. GDE Startup
Figure 2-2. Setting the I
2
C Command Tool.
2
C Initialization Sequence
TAS3308 Software Installation
2
C
Quick Setup Guide