Rca Connectors; Msp430 Port Connector (J3); I 2 S Master Slave Jumper (Jp3); J9 Pin Description - Texas Instruments TAS3308EVM User Manual

Evaluation module for the tas3308 digital audio signal processor
Table of Contents

Advertisement

www.ti.com
PIN NO.
1
2
3
4
5
6
7
8
9
10
3.6

RCA Connectors

PIN NO.
1
2
3.7

MSP430 Port Connector (J3)

PIN NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2
3.8
I
S Master Slave Jumper (JP3)
SLEU093 – March 2008
Submit Documentation Feedback
Table 3-5. J9 Pin Description
NET-NAME AT SCHEMATICS
GND
MCLKO
GND
SCLKout
GND
LRCLKout
GND
SDOUT1
GND
SDOUT2
Table 3-6. RCA Connectors Pin Description
NET-NAME AT SCHEMATICS
Signal
AGND
Table 3-7. J3 Pin Description
NET-NAME AT SCHEMATICS
TDO
TCLK
3.3 V
TMS
TCK
TEST
GND
RESET
1
2
3
PCB Connector (Top View)
DESCRIPTION
Ground
Master clock input
Ground
2
I
S bit clock
Ground
2
I
S left-right clock
Ground
2
I
S data 1, channel 1 and 2
Ground
2
I
S data 2, channel 3 and 4
DESCRIPTION
Channel input/output – tip
Analog ground – sleeve
DESCRIPTION
TDO
TCLK
3.3 V
TMS
TCK
TEST
GND
RESET
RCA Connectors
System Interfaces
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS3308EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents