About This Manual
This manual describes the operation of the TAS3308EVM evaluation module from Texas Instruments.
How to Use This Manual
This document contains the following chapters:
Chapter 1 – Overview
Chapter 2 – Quick Setup Guide
Chapter 3 – System Interfaces
Chapter 4 – MSP430
Information About Cautions and Warnings
This manual may contain cautions and warnings.
This is an example of a caution statement.
A caution statement describes a situation that could potentially damage your
software or equipment.
This is an example of a warning statement.
A warning statement describes a situation that could potentially
cause harm to you.
The information in a caution or a warning is provided for your protection. Please read each caution and
warning carefully.
Related Documentation From Texas Instruments
The following table contains a list of data manuals that have detailed descriptions of the integrated circuits
used in the design of the TAS3308EVM. The data manuals can be obtained at the URL http://www.ti.com.
SLEU093 – March 2008
Submit Documentation Feedback
CAUTION
WARNING
Related Documentation from Texas Instruments
Part Number
TAS3308
TLV1117-33
TPS3825-33
Read This First
Literature Number
TAS3308 Data Manual
SLVS561
SLVS165
Preface
SLEU093 – March 2008
Read This First
5
Need help?
Do you have a question about the TAS3308EVM and is the answer not in the manual?