INSTALLATION

PLEASE CHECK THE ADDITIONAL DELIVERED EXPLO-
DED VIEW FOR ALL POSITION NUMBERS
Tighten Fasteners Before Setup
Before using the pump for the first time, check
and retorque the housing bolts (23). Also the valve
stops of the discharge valves (09) have to be
checked. Also after the first day of operation, after
periods of important temperature fluctuations, after
Recommended installation drawing
A
Figure 1 showing the installation of the pump
transport, after dismantling of the pump and
after periods when the pump hasn't been working
the stops, plugs and housing bolts have to be
checked. For the housing bolts please use the
torque values as mentioned on page 18.
E
E
VERDERAIR_VA-C manual_rev2_2020_UK_(uk) | 1.12.2020
C
B
D
B
A Air Control pro unit consists of:
- On/of valve
- Pressure regulator
- Throttle valve
- Soft start valve
B Isolating valve
C Discharge gauge
D Suction gauge
E Flexible connection