Installation And Connection; Preparing For Installation; Checking The Ambient Conditions; Preparing The Installation Site - VERDER VERDERFLEX Dura 55 Series Operating Manual

Peristaltic hose pump
Table of Contents

Advertisement

6.

Installation and Connection

Material damage due to unauthorized modification on
pump!
Unauthorized modification will invalidate the warranty.
X

6.1 Preparing for installation

6.1.1 Checking the ambient conditions

1.
Make sure that the operating conditions are complied
with (g 11. Technical specifications)
2.
Make sure the required ambient conditions are fulfilled
(g11. Technical specifications)

6.1.2 Preparing the installation site

Ensure the installation site meets the following
X
conditions:
Pump is freely accessible from all sides.
Sufficient space is available for the installation/
removal of the pipes and for maintenance and
repair
work,
installation of the hose.
The pump and drive unit must not be installed in direct
X
sunlight or exposed to rain without suitable shade cover.

6.1.3 Preparing the foundation and surface

Make sure the foundation and surface meet the
X
following conditions:
Level
Clean (no oil, dust or other impurities)
Capable of bearing the weight of the pump and all
operating forces
Ensure the pump is stable and cannot tip over
Concrete foundation: Standard concrete strong
enough to support the pump under load.

6.2 Installation at site

1.
Lift the pump. (g4.1.2 Lifting)
2.
Put the pump down at the installation site.
3.
Bolt the pump down; use all 4 holes.
Original instructions (en)
CAUTION
especially
for
the
removal
© Verder Liquids B.V
Dura 55 series - Operating manual
and
Version 01
13 | Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Verderflex dura 55Verderflex dura 55hf

Table of Contents