Vertical timing
During vertical synchronization, as in horizontal synchronization, the counter is reset when DVD falls and
incremented when HD falls (see Fig 12.1-4 and Fig 12.1-5).
Set the Field 1 and Field 2 blanking periods separately for each TV system in the blanking start parameters in
Table 12.1-6.
Analog ODD Field ・ Digital Field 1
DHD
DVD
DFLD
(Internal signal)
V counter
261
262
(Internal signal)
TRC_F
TRC_V
EAV = DA[h]
TRC code
SAV = C7[h]
Analog EVEN Field ・ Digital Field 2
DHD
DVD
DFLD
(Internal signal)
V counter
260
261
(Internal signal)
TRC_F
TRC_V
EAV = 9D[h]
TRC code
SAV = 80[h]
line4
line5
line18
line19
line20
line21
line262
line263
line264
line265
0
1
2
3
EAV = F1[h]
SAV = EC[h]
0
1
2
3
262
EAV = B6[h]
SAV = AB[h]
Field1(ODD)
The line number of an analog composite signal
Fig 12.1-4 Vertical Direction Timing NTSC
4
5
6
7
V-blanking 19line
EAV = B6[h]
SAV = AB[h]
4
5
6
7
V-blanking 19line
EAV = F1[h]
SAV = EC[h]
185
- SS-HQ1 Application Notes -
Ver.1.0.0 January 7, 2005
8
9
17
18
8
9
17
18
Field2( EVEN )
19
20
21
EAV = 9D[h]
SAV = 80[h]
19
20
21
EAV = DA[h]
SAV = C7[h]
line266
line267
line280
line281
line282
line283
line524
line525
line1
line2
line3