Installation Prerequisites; Table 3-2. Turn-Up And Provisioning Prerequisite Information - ADTRAN NetVanta 1224 Installation And Maintenance Practice

Quad t1 ima 24-port dslam
Hide thumbs Also See for NetVanta 1224:
Table of Contents

Advertisement

INSTALLATION PREREQUISITES

The following items should be completed prior to installing the Total Access 1224:
1. Make sure that the network feed is in place.
2. Make sure that local power is available and that the required fuses are installed.
The maximum power draw for the Total Access 1224 system is 50
watts.
The Total Access 1224 system should be fused at 3.0 amps.
3. Complete
Table 3-2
Access 1224.

Table 3-2. Turn-up and Provisioning Prerequisite information

Item Description
Network Feed/Aggregation System IP Address
Network Feed/Aggregation System Port
Total Access 1224 IP Address
Total Access 1224 Default Gateway
Total Access 1224 Subnet Mask
Total Access 1224 VPI/VCI
Number of Network Facilities Feeding the Total Access 1224
CLEI Code/System Name
61179621L1-5C
CAUTION
with the information that is needed to turn-up and provision the Total
Installation Prerequisites
Value
3-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Total access 1224

Table of Contents